Skip to main content
Manufacturers and factories

What you make, how much, to which standard

A buyer is not reading a story. He is checking whether you can carry his order, units per month, which lines, which certificates, and what happens when the order is ten times bigger. From €450.

Starting prices. Every project gets its own quote.

What a buyer checks in the first two minutes

  • Up to 12 products in the catalogue — each with material, dimensions, tolerances and a technical sheet he can download without writing to you. (included from €450)
  • Capacity in figures — units per month per line, number of shifts, minimum order quantity, batch size. A buyer drops the supplier who keeps those numbers behind a contact form.
  • Certificates and standards, as a COMPLETE list — if you cannot publish everything, we state on the page that the list is partial, and we put into it exactly what buyers in your sector ask for most often, not only what is comfortable to show. A missing certificate inside a list that looks complete makes the buyer believe you hold it.
  • The lead times you can actually stand behind — each with its condition: from stock, made against stock, made to order. Where a volume is beyond your line, the page says so instead of going quiet.
  • Count for yourself: out of ten manufacturers in your sector, how many state minimum order quantity and monthly capacity without a phone call?

Send us the product sheets and the capacity figures

We need the product list, the capacity numbers and the certificate list exactly as it stands today, complete. What is not certified yet does not appear as if it were. If the list is partial, we declare it partial on the page and name what is missing from it.